Blackbutt Decks & Pergolas

How a job runs

Quote, design, build, handover. Most of the wait is the approval, not the build.

Two people looking at a printed plan together in a garden

Design visit. Stand-in photo from the Wildmoor Landscapes pack.

Five stages

From first visit to first barbecue

Approvals take three to six weeks, so a deck you want for Christmas needs starting now.

Quote · About an hour, free

Design visit

We come out, measure, check the ground and boundaries, and talk through how you would use the space. We sketch options with rough costs while we are there, and leave you with a realistic budget. No charge, no deposit.

Design · Within a week

Drawings & fixed quote

A plan and elevation, timber and finish selections, and one fixed price with the approvals inside it.

Approval · 3–6 weeks

Engineering & approval

Mostly waiting. Footing sizes come from a real engineer for your soil class and wind rating. We lodge with a private certifier, which is faster than council, and keep you posted.

Build · 2–5 weeks on site

Build

Depending on size and height: footings, frame, deck, then cover, electrical and finishes. The same two or three carpenters for the whole job. Our electrician and roofer are the only other trades.

Handover

Certify & hand over

Final inspection and the certificate issued. We show you how to oil the timber and when. Site left clean.

The short version

What to expect, in numbers.

1 hrFree design visit
1 wkTo drawings and a fixed quote
2–5 wkOn site, depending on size
OneCarpentry crew, start to finish

What you do, and what we do

Nothing to lodge, nobody to chase

You

Show us the yard, tell us how you would use it, and approve the drawings and the fixed price.

We

Engineering, the private certifier, council paperwork, the build and the final inspection.

Together

A handover walk-through: how to oil the timber, and when.

A concrete footing with a timber post and bearer under a raised timber floor

Footing and bearer. Stand-in photo from the Stonebridge Build Co. pack.

Why it takes the time it takes

Designed in, not patched on

Airflow under the frame, a gap at the house, and boards laid so water runs off rather than sitting in the joint. It is invisible, and it is why a deck lasts thirty years instead of twelve.

Free design visit

Book a design visit before spring

Approvals take three to six weeks, so a deck you want for Christmas needs starting now.