Sloping sites, narrow yards, character homes with no side access. We have built in all of them. Fully engineered concrete pools, designed and built by the one company from first sketch to handover.
Soil test, engineering plans, council or private certifier lodgement.
2
Excavation
Dig, spoil removed, temporary fencing up the same day.
3
Steel & concrete
Reinforcement tied and inspected, shell sprayed, then it cures.
4
Tiling & interior
Waterline tile, coping, and fully tiled or pebble interior.
5
Paving, fence, plant
Surrounds laid, compliant fencing, equipment plumbed and wired.
6
Fill, certify, swim
Water balanced, safety certificate issued, handover walkthrough.
A house behind a hedge, the kind of site we build behind. Photo from the Stillwater content pack.
Why Stillwater
One company, one contract, one person to call.
Most pool horror stories come from a sales company that sells the pool, then hands you to a chain of subcontractors nobody is coordinating. We employ our own excavation, steel, concrete and tiling crews.
Fixed price after the site visit
Soil test, engineering, excavation, approval and certification are all in the number.
Weekly photos, whether you ask or not
A short update every Friday with what is happening next week.
We finish the whole yard
Coping, paving, fencing, turf and the pump enclosure.
Handover that teaches you the pool
An hour on site, plus three months of free water testing.
The short version
What you are signing up for.
A fixed price, one contract and a site visit that costs nothing.
14–18Weeks to build, in six stages
OneCompany, contract and contact
FixedPrice after the site visit
FreeSite visit, costs nothing
What owners tell us afterwards
“Our block drops nearly three metres. Two builders said it couldn’t be done for the budget. Stillwater engineered a raised wall, and that wall is now the best-looking thing in the yard.”
“Sixteen weeks from the first dig to swimming, and the price at the end matched the contract exactly. The Friday photo updates meant I never had to chase anybody.”
“They resurfaced our 1980s pool and replaced all the old equipment. Running cost dropped by more than half with the new variable-speed pump.”
Demo testimonials from the content pack.
A finished pool from above. Photo from the Stillwater content pack, not a map.
Where we build
Brisbane, the bay and the western suburbs
We deliberately keep the build radius tight. Our crews are on your site most days of the build rather than driving between the Sunshine and Gold Coasts, which is half the reason our timelines hold.