Services

Three builds. One contract each.

Whatever the shape of the job, the shape of the deal is identical: fixed price, named site manager, weekly photos, 10-year structural guarantee.

In detail

What each build involves.

Timescales included, because ‘it depends’ isn’t a schedule.

Extensions

From footings to final fix in one contract — groundworks, structure, glazing, plumbing, electrics and decoration, coordinated by your site manager. A typical single-storey runs twelve to sixteen weeks; you get the real number in the quote.

A carpenter framing a new timber-stud wall for a Queenslander extension
A crew working beneath a Queenslander lifted on steel stumps

Raise & build under

Lifting a Queenslander onto new stumps and building a proper level underneath — laundry, rumpus room, another bedroom — to council and engineering approval. Eight to ten weeks, most of it from outside.

Full renovations

Rewires, replumbs, walls moved and rooms rethought — phased room by room if you’re living in, flat out if you’re not. The schedule shows which weeks are loud, so you can plan around them.

A carpenter inside a gutted Queenslander room during a renovation
The Stonebridge standard

Four clauses in every contract.

Not marketing — contract language.

◆

Fixed price

The quote is the price. Changes only move it if you change the job.

◇

Named site manager

One person, one phone number, on your site from day one to handover.

◈

Weekly photo updates

Every Friday: photos, progress against schedule, and what happens next week.

❖

10-year guarantee

Structural work guaranteed for a decade, backed by insurance, in writing — alongside QBCC’s statutory Home Warranty Insurance on residential work over $3,300, not instead of it.

Common questions

Asked before most contracts.

Yes — we work with your architect or introduce one of the three we trust, and building control sign-off is inside our contract, not an extra you chase later.

Usually — extensions and lofts are sealed off from the living space, and renovations get phased room by room. The quote states which weeks the water and power blink.

Genuine unknowns — what’s under the floor, inside the wall — get surveyed before we quote, which is why our quote takes a week, not a day. If we still miss something, that’s our cost, not yours. Only client changes change the price.

Get the number that doesn't move.

Send drawings if you have them, photos if you don’t — a fixed-price quote follows a site survey, and both cost nothing.