Most deck problems in this city are drainage problems.
Brisbane gets 1,100mm of rain, most of it in a handful of storms, and the humidity does the rest. A deck that traps water against the house or has no airflow under it will rot from below no matter how good the timber was. That’s what we design around first.
Ventilation and fall, designed in Airflow under the frame, a gap at the house, and boards laid so water runs off rather than sitting in the joint. It’s invisible and it’s why a deck lasts thirty years instead of twelve.
Engineered and certified, always Footing sizes from a real engineer for your soil class and wind rating. Anything over a metre high or attached to the house legally needs it — and it’s the first thing a buyer’s inspector looks for.
We do the council paperwork Plans, engineering, private certifier and final inspection — all in the quoted price. You don’t lodge anything or chase anyone.
One carpentry crew, start to finish The same two or three faces for the whole build. Our electrician and roofer are the only other trades on site, and we’ve used both for years.