There's no undo button on a house lift.
Twenty-two tonnes of timber goes up on jacks and every millimetre of movement has to be even, or you crack plaster, split VJ boards and twist door frames. It’s the least forgiving work in residential building, and the reason we only do this.
Engineer-designed on every job Footings sized for your soil class and the real loads, with certified drawings. Not a rule of thumb from someone’s ute.
We’re the builder, not a subcontractor One contract covers the lift, the columns, the slab and the build-in. No gap where the lifting crew leaves and nobody owns the next step.
Character and heritage experience Most of Brisbane’s pre-1947 stock sits in a character overlay, and raising it is assessable development. We’ve taken hundreds through that process.
Straight answer before you spend Some houses shouldn’t be raised — badly rotted frames, unsympathetic past renovations, or a block that won’t take the height. We’ll tell you at the inspection, not after the plans.